Twenty years below ground.
Hoffman Tunnels has spent more than two decades doing the same thing well: figuring out what the ground will do, and building something that lasts.
What we have delivered.
We have grown deliberately: one project team at a time, one market discipline at a time, and one lesson from the ground at a time. Every entry below represents a structure that is still in service — and a team that learned something on the way.
2005
The company is founded
- 2005Jason Hoffmann establishes Hoffman Tunnels with a small team of tunnel and geotechnical engineers.
- 2005First contract awarded: temporary works and excavation support design for a deep urban sewer shaft.
2010s
Building the practice
- 2010A high-pressure water conveyance tunnel is completed in Washington State.
- 2011A major water conveyance pipeline is commissioned, including the largest single-pass fibreglass microtunnel of its time.
- 2012A 15-mile water conveyance tunnel is commissioned in San Diego County — an early benchmark in performance-based seismic design.
- 2014An immersed-tube water supply crossing beneath a major bay is commissioned.
- 2015A tunnel crossing an active fault is commissioned in Hayward, California.
- 2017A road tunnel opens to traffic in Auckland, New Zealand.
- 2019A pipeline drive sets the record for the longest ever installed with the Direct Pipe system.
2020s
Global delivery
- 2020A deep CSO storage tunnel is completed in New York, cutting combined sewer overflows by design.
- 2021A light rail extension opens for public service in Seattle, Washington.
- 2022A subway extension opens for public service in San Francisco, California.
- 2022A gravity trunk sewer and pump station network is commissioned in Auckland — 15 kilometres in total.
- 2023North America's largest-diameter curved microtunnelling drive is completed in Calgary, Alberta.
- 2024A deep underground science facility cavern complex is completed in a former mine, with ultra-low vibration design.
- 2026Hoffman Tunnels celebrates more than two decades of underground engineering across four markets, from its head office in München.
The practice, measured.
2005
Founded
1,200+
Projects
1
Head Office
4
Markets