A four-bore highway tunnel through the hills, including a 3.5-mile bore and seismic retrofit.
Tunnel design, seismic analysis and construction management for a major highway tunnel.
The scope covered a new parallel bore, cross passages, a drainage and fire-protection system, and seismic resilience features designed for a near-fault site. Complex ventilation and emergency egress design supported a demanding operational and safety case.
Scope of work
- Tunnels & Underground Engineering
- Structural Engineering
- Construction Management

Project facts
- Bores
- 4
- Longest bore
- 3.5 miles
- Seismic
- Near-fault design
- Completion
- 2014