Wastewater
Project
A large-diameter force main including a difficult river crossing and deep urban shafts.
Force main design, river-crossing engineering and deep shaft construction management.
Trenchless installation reduced traffic impact while deep shafts delivered the vertical connection to the treatment system.
Scope of work
- Pipeline Engineering
- Trenchless Engineering
- Construction Management

Project facts
- Feature
- River crossing
- Method
- Trenchless
- Shafts
- Deep urban
- Completion
- 2015





