A 3.6-mile steel-lined pressure tunnel and two large-diameter shafts in an active fault zone.

Design and construction phase services for a critical regional water conveyance tunnel.

Crossing the active fault demanded exceptional seismic resilience: flexible joints, deformable lining segments and shafts designed for a full-life serviceability target far beyond code minimums.

Scope of work

  • Tunnels & Underground Engineering
  • Geotechnical Engineering
  • Structural Engineering
Hoffman Tunnels provided tunnel and underground design, engineering and construction-phase support.

Project facts

Length
3.6 miles
Shafts
2
Seismic
Fault crossing
Completion
2015