Water

Rondout-West Branch Bypass Tunnel

A deep rock pressure tunnel bypassing an ageing aqueduct, including a 1,100-foot drop shaft.

Feasibility through detailed design for a deep pressure tunnel and vertical drop shaft.

Over 900 feet of cover demanded careful characterisation of jointed rock and a lining concept capable of managing long-term groundwater pressure.

Scope of work

  • Tunnels & Underground Engineering
  • Advisory Consulting
Rondout-West Branch Bypass Tunnel — New York, NY
Rondout-West Branch Bypass Tunnel, New York, NY. Hoffman Tunnels provided tunnel and underground design, engineering and construction-phase support.

Project facts

Cover
900+ ft
Drop shaft
1,100 ft
Type
Pressure rock
Completion
2015
Related work

More water projects

Bay TunnelWater
San Francisco Bay, CA2014

Bay Tunnel

A 5.5-mile immersed-tube rock tunnel carrying drinking water across the San Francisco Bay.

View project
Bay Tunnel project details
New Irvington TunnelWater
Hayward, CA2015

New Irvington Tunnel

A 3.6-mile steel-lined pressure tunnel and two large-diameter shafts in the Hayward Fault zone.

View project
New Irvington Tunnel project details
San Vicente TunnelWater
San Diego County, CA2012

San Vicente Tunnel

A 15-mile, high-pressure conveyance pipeline, a landmark in seismic-resilient design.

View project
San Vicente Tunnel project details
Next steps

Planning something underground?

Every project starts with a conversation about your ground, your constraints, and your programme.